Major development proposals registered with the department of planning
The proposals below from http://www.planning.nsw.gov.au/asp/register.asp may be of interest to you. When the proposals are on exhibition they should be presented at http://www.planning.nsw.gov.au/asp/major_projects.asp or via http://www.planning.nsw.gov.au/assessingdev/onexhibition.asp
PART 3A PROPOSALS:
|
|
Proposal title: Concept Plan MP 07_0027
Description: Concept plan for construction of residential, commercial, retail, hotel, marina facilities, technology park and subdivision.
Location: Boollwarroo Parade, Shell Cove, Shellharbour.
Local Government Area: Shellharbour City Council
Approval Authority: Minister for Planning
Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
Proponent: Australand Corporation Pty Ltd
Status: 21 February 2007
Documents available: Major Projects Application, Shell Cove PEA
Further inquiries: Eng-Joo Ong : (02) 92...
|
|
Proposal title: 07_0030 Tallawarra Open Cycle Gas Peaking Plant
Description: TRUenergy Tallawarra Pty Ltd proposes to construct and operate an Open Cycle Gas Turbine (OCGT) Plant at Yallah, in land adjacent to the Combined Cycle Gas Turbine Power Station currently under construction on the shores of Lake Illawarra. The OCGT Plant would have a notional capacity of up to 450 MW and would comprise 2 to 3 gas turbines. It would operate to supply electricity during periods of peak demand or system emergency situations. Other project components include high voltage switchyard comprising high voltage transformers and switchgear, transmission line connection to the existing 132 kV network, connecting gas pipelines to the Eastern Gas Pipeline including a gas receiving station and gas conditioning station, distillate storage tank and unloading station, demineralised water tank, and an emergency diesel generator.
Location: Yallah Bay Road, Yallah, Lot 109 DP 1050302
Local Government Area: Wollongong Local Government Area
Approval Authority: Minister for Planning
Relevant Legislation: Part 3A Environmental Planning and Assessment Act, 1979
Proponent: TRUenergy Tallawarra Pty Ltd
Date of Application: 3 April 2007
Status: Major Project Application received on 3 April 2007; Director-General’s requirements for the Environmental Assessment issued on 8 May 2007
Documents available: Major Project Application, Preliminary Assessment, Director-General’s requirements for the Environmental Assessment
Further inquiries: Ricardo Prieto-Curiel (02) 9228 6112 or ricardo.prieto-curiel@planning.nsw.gov.au
|
|
Proposal title: State Significant Site and Major Project (concept plan) application for Albion Park Airport Business Park, Albion Park (MP 06_0272)
Description: The Proponent is seeking to rezone and list the Subject Site as a State Significant Site in Schedule 3 of State Environmental Planning Policy (Major Projects 2005) to facilitate the development of the site for light industrial/business park uses and environmental conservation.
The Proponent is also concurrently seeking approval for a concept plan for the proposed business park under the provisions of Part 3A of the Environmental Planning and Assessment Act 1979.
Location: 78 Tongarra Road, Albion Park
Local Government Area: City of Shellharbour
Approval Authority: Minister for Planning
Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
Proponent: Delmo Albion Park Pty Ltd
Status: Minister agreed to consider the Site a potential State significant site and authorised the submission of a concept plan on 28 September 2006.
Director-General's requirements issued 22 November 2006
Documents available: Part 3A State significant site major project nomination and concept plan authorisation request.
Preliminary Information, Janet Thomson Planning Consultants
Director Generals Requirements
Further inquiries: Annette Schifko (02) 92...
|
|
Proposal title: Proposed Ore Preparation Plant Upgrade, BlueScope
Steelworks, Port Kembla. (Application: 06_0229)
Description: Upgrade and increase in the production capacity of the Sinter Plant from 5.5 million tonnes to 6.6 million tonnes per annum. The upgrade to the Sinter Plant includes:
construction of new infrastructure to improve the efficiency of operations, including: installation of new strand feeding technology; installation of a new ignition furnace; lengthening and deepening of the sinter strand and modification of structural components of the strand;
repair and refurbishing of equipment such as waste gas precipator shells and internals; room de-dusting and associated duct work; wind boxes; and waste gas mains and attached dust hoppers;
rebuilding of Sinter Cooler and modification to the three existing 1.25MW cooler fans;
extension of Sinter Plant building by approximately 14m at the Sinter Cooler end; and
works within the Raw Materials Handling Area to increase the fines handling and storage capacity. Works to be undertaken include: construction of seven new conveyors, installation of a new shuttle conveyor, rebuilding of a Conveyor House and other minor maintenance works.
Location: BlueScope Steelworks, Five Island Road, Port Kembla
LGA: Wollongong City Council
Approval Authority: Minister for Planning
Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979
Proponent: BlueScope Steel (AIS) Pty Ltd
Status: On exhibition Monday 5 March 2007 to Thursday 5 April 2007
Documents available:
Director-General's Requirements
Major Projects Application
Environmental Assessment
Report
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Further inquiries: Patricia Cabezas or patricia.cabezas@planning.nsw.gov.au
|
|
Proposal title: Extension of the Gerroa Quarry (MP05_0099)
Description: TExtension of the Gerroa Quarry.
Location:
Local Government Area: Shoalhaven and Kiama.
Approval Authority: Minister for Planning.
Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005.
Proponent: Cleary Bros (Bombo) Pty Ltd.
Application number: 05_0099
Status: Proponent currently preparing the Environmental Assessment.
On exhibition Wednesday 8 November 2006 to Tuesday 19 December 2006
Submissions report received, finalising assessment
Documents available:
Major Projects Application.
Preliminary Assessment and Figure 2.
Director General's Requirements.
Figure2-3
Figure5-3
Response to Submissions
Environmental Assessment
Appendix A Requirements of the Director General
Appendix B Public Authority Responses
Appendix C Community Consultation Leaflet
Appendix D Community Consultation Correspondence
Appendix E Geotechnical Assessment
Appendix F Rehabilitation Work Instruction
Appendix G Acid Sulphate Soil Manageent Plan
Appendix H Flood Study
Appendix I 2005 Flora and Fauna Assessment, Entiry Property
Appendix-I-Figure2
Appendix J 2006 Flora and Fauna Assessment, Project Area
Appendix-J-Figure4
Appendix K Draft Vegetation Management Plan
Appendix-K-VMPFigure
Appendix L Aboriginal Archaeological Assessment
Appendix M Screen Planting Details
Appendix N Noise Assessment
Appendix O 2001 Traffic Report
Revised Compensatory Planting
Further inquiries: Michael Young - .
|
|
Proposal title: Residential subdivision (MP 07_0032)
Description: Subdivision of land to accommodate approximately 182 dwellings, construction of roads and other infrastructure works, including recreation of riparian corridors at Sandon Point
Location: Sandon Point
Local Government Area: Wollongong
Approval Authority: Minister for Planning
Relevant Legislation: Part 3A of the Environmental Planning and Assessment Act 1979 and State Environmental Planning Policy (Major Projects) 2005
Proponent: Stockland Development Pty Ltd
Status: Preliminary assessment (9 March 2007); Director General's Requirements issued (1 May 2007)
Documents available: Preliminary Assessment
Director General's Requirements
Further inquiries: Izlem Boylu (02) 9228 6369
|
|